Scenario readiness check · 5 weeks · one site
In five weeks we show what stops at your site if a drone hits it, what one day of downtime costs and which measures cut the loss most. First findings in week two. We work under NDA.
Five questions owners and site directors bring to us, and the answer you get.
An illustrative site: a fuel depot, a substation, a boiler house, two workshops and a finished-goods warehouse. In your report the map is built from your site plan.

Preparation takes five weeks. A fire after a strike spreads in minutes. Here is what 2026 showed in the Gulf.
Five weeks from the first meeting to the report to the owner. Every step ends with a document you keep.
Time from your people: one to two hours of interviews each for the chief engineer and the heads of production, warehouse, logistics and security; three hours of management time in week four.
We choose the measures with you and rank them by the loss each dirham avoids.
Illustrative example: a manufacturing site with revenue of AED 400 million a year.
Four documents used by the owner, management, the CFO and security. Figures in the samples are illustrative.
The three main vulnerabilities and the decisions, on two pages.
Buildings, fire zones and single points of failure.
Property damage, downtime and consequences before and after the measures.
What to do in 90 days and in a year, who owns it, what it costs.
We see the most sensitive things: the site plan, stocks, contracts and the weak points of the site. So the rules for your data are fixed before we start.
The price is for one site. For several sites we send a quote within two working days.
If within six months you order the Resilience audit and improvement programme, 50% of the price of the check is credited.
Options
Good to know
An audit or an inspection checks compliance with requirements. The readiness check answers the owner’s question: how much the company loses in a strike and which measures cut the loss most per dirham. We use those documents as input.
No. We are not tied to manufacturers or integrators, so our advice is independent. If you need engineering protection, we help you write the requirements for it.
The site plan, a list of buildings, stocks and equipment, revenue by product and key contracts. Everything is shared under NDA and stays with you. For restricted sites we agree the procedure with your security team.
The chief engineer and the heads of production, warehouse, logistics and security: one to two hours of interviews each. Management: three hours for the working session in week four.
Yes, if the site is closed to visitors: we work from the site plan, photos and a video walk-through. Conclusions on fire spread are then less precise, and we say so in the report.
Yes, as evidence. The report describes critical activities, the impact of their loss over time and the recovery measures, in the terms of AE/SCNS/NCEMA 7000 and ISO 22301. It does not replace a full business continuity management system.
The check covers one scenario for one site in five weeks and ends with a roadmap. The programme builds continuity for the whole company: plans, roles, exercises and metrics. 50% of the price of the check is credited if you move to the programme within six months.
Three steps to the start. We meet on Zoom and write by email.
Leave your contacts. We reply within one working day and arrange a call or a Zoom meeting. If needed, we sign an NDA before the conversation.