Hospitality · scenario guide · GCC
A power cut, a water outage or an incident nearby stops a hotel at full occupancy within hours. This guide shows the five decisions that decide the loss, and what to have ready before the day comes.
The questions general managers bring to us on the first day of a disruption, and the answer that keeps guests and money.
A 250-room resort with two guest wings. In your assessment the plan is built from your drawings and walk-through.
Three options for every guest, decided in the first hour and written down.
The humanitarian minimum is 15 litres per person per day for drinking, cooking and basic hygiene. Count guests and staff, not rooms.
Tanks hold 18,000 litres, two days for 600 people: the third day comes from a tanker contract. Drinking water on top, 3 litres per person per day, about 3,600 bottles of 1.5 litres. Illustrative example.
Food is a cost line that turns into a loss line within a day when deliveries stop.
Most complaints and claims after a disruption come from four things: guests were not told in time, they were charged for services that were closed, safety was not recorded, or the desk promised what the hotel could not deliver.
Payroll keeps running when revenue stops. The aim is to cut cost without losing the people you need when guests return.
Source: The National, 1 March 2026
The order in which a hotel team acts. Every step leaves a record you keep.
A five-day disruption at an illustrative 250-room hotel.
Illustrative example: 250 rooms, average rate AED 900. Loss includes refunds, relocation, spoiled stock and claims.
Five working documents. A general manager can start them this week.
Who needs help first, offline and updated nightly.
Reserve in litres, daily use and the tanker contract.
Two sources for every critical item.
Templates in Arabic and English and a timed log.
Core crew, shifts, leave and contacts.
Count people, not rooms: guests and staff on site times 15 litres per person per day, the humanitarian minimum, for the days you plan to hold out. Keep bottled drinking water on top and a signed tanker contract.
Keep them if you can give power, water and safety in one wing. Move them when you cannot, and agree partner hotels in advance so the move takes an hour, not a day.
Charging for services that were not delivered is the most common trigger of complaints and disputes. Adjust the rate or give a credit while they are closed, and check changes to your terms with a lawyer.
Keep a core crew, move the back office to remote work, and agree leave, reduced hours and rotation before any layoff. People you lose now are the hardest cost to recover.
With three documents this week: the offline list of guests who need help first, the water reserve count and the supplier matrix. Then test them in a one-hour tabletop exercise.
We reply within one working day and arrange a call or a Zoom meeting. If needed, we sign an NDA before the conversation.